Help with your seawall project·Palm Coast
Flagler Beach · Your waterfront project

Flagler Beach waterfront guide

Flagler Beach owners should separate Smith Creek and Intracoastal work from Atlantic beach protection, then use the city’s marine and drainage records.

Describe your project on this page ↓
Flagler Beach waterfront mapNorth is up. The accent marker identifies the selected community. Choose a community label to open its local guide. Nearby guide links also appear below the map.Flagler BeachFlagler Beach waterfront mapNorth is up. The accent marker identifies the selected community. Choose a community label to open its local guide. Nearby guide links also appear below the map.Flagler Beach
Land: U.S. Census Bureau, minus Census and Palm Coast GIS water polygons. Community references: city GIS and Census boundaries. Snapshot: October 26, 2026. General orientation only; not a survey or service-availability boundary.

Get to know your waterfront

Flagler Beach has its own Building and Engineering office at the Wickline Building. The city publishes marine construction and separate grading or drainage forms. Betty Steflik Preserve documents the local salt-marsh and black-mangrove setting, while the county links Smith Creek tide information. These resources help distinguish a tidal waterfront assessment from an oceanfront coastal-armoring question.

Local geography and records: Flagler Beach · Flagler Beach Building and Engineering · Flagler Beach marine permit forms · Betty Steflik Preserve · CCCL application guidance · Local tide and water-level gauges

Bring the wall and grading questions together — your checklist

Use these steps to turn the local context into a property-specific project brief.

  1. Choose the shoreline path

    Locate the wall on creek, Intracoastal or ocean frontage.

    Local geography and records: Flagler Beach · Flagler Beach Building and Engineering

  2. Ask about related reviews

    Check grading, drainage and right-of-way requirements.

    Local geography and records: Flagler Beach · Flagler Beach Building and Engineering

  3. Collect the final records

    Keep building, engineering and environmental completion documents together.

    Local geography and records: Flagler Beach · Flagler Beach Building and Engineering

Bring the wall and grading questions together

Show proposed changes to the wall, retained grade and outlets to the city early. Ask whether the project also requires drainage, right-of-way or grading review. Where natural marsh lies beside the structure, have the environmental reviewer identify the work limits and protection measures before the contractor prices clearing or access.

Local records worth knowing

  • Flagler Beach is a separate incorporated city.
  • Building and Engineering operate from 800 S. Daytona Avenue.
  • Its forms include a seawall/dock/boathouse/deck application.
  • Betty Steflik Preserve contains salt marsh and black-mangrove communities.
  • The county publishes a link to Smith Creek tide observations.

What could the work cost?

Use the city’s current fee schedule and the proposed scope. Include any grading review, habitat protection and dock or utility work instead of comparing only a wall-material price.

Published Florida planning ranges, not Palm Coast quotes. Confirm the full scope for your property.

Compare quotes and plan a budget →

Find the relevant permits and records

Flagler Beach researched starting points
Starting pointWhat to resolvePrepare and look up
Flagler Beach Building
Confirm the parcel, proposed scope and current submission route.
Bring parcel ID, survey and the work description. 386-517-2000, option 3.
Environmental and waterway review
Identify existing drainage approvals, habitat and any state or federal review.
Show alignment, access and all connected work.

Prepare the questions for the responsible office.

Start with what you know

Plan your Flagler Beach project

Describe the location and what has changed. Keep your survey and any earlier records with the project notes.

Getting your form ready…

Flagler Beach project questions

Does the city permit replace DEP approval on the beach?

No. Local and state coastal questions are separate. Locate the CCCL and ask DEP what applies to the proposed oceanfront work.

Flagler Beach Building and Engineering · Flagler Beach marine permit forms

Keep planning

Nearby waterfront guides

Beverly Beach, Palm Coast Plantation

View the local guide directory.

Show sourcesHide sources
  1. Local geography and records: Flagler BeachSource reviewed 2026-10-26
  2. Flagler Beach Building and EngineeringSource reviewed 2026-10-26
  3. Flagler Beach marine permit formsSource reviewed 2026-10-26
  4. Betty Steflik PreserveSource reviewed 2026-10-26
  5. CCCL application guidanceSource reviewed 2026-10-26
  6. Local tide and water-level gaugesSource reviewed 2026-10-26
  7. DEP Northeast DistrictSource reviewed 2026-10-26
  8. SJRWMD ePermit resourcesSource reviewed 2026-10-26
  9. USACE Jacksonville officeSource reviewed 2026-10-26